Guides & insights

Field notes from the drafting table.

Practical guidance on shop drawings, AWI standards, software, and the operations side of running a millwork shop.

Featured · Technical

The Complete Guide to Commercial Millwork Shop Drawings (2026)

What separates a production-ready commercial millwork package from one that gets kicked back — how to scope, draft, submit, and post work that passes review the first time.

Read article →
Shop Drawing Guides

What AWI compliance actually means for your drawings.

What AWI compliance actually requires of a millwork shop-drawing set — the QCP, Economy vs Custom vs Premium grades, and how Millmetric meets the standard on every deliverable.

Read article →
Shop Drawing Guides

AWI Economy vs Custom vs Premium Grades: What Each Requires of Your Drawings

A plain-language breakdown of the three AWI grades and exactly what each one demands of your shop drawings, joinery, and finish callouts.

Read article →
Shop Drawing Guides

CNC-Ready Millwork Shop Drawings: What "Ready" Actually Means

A drawing set that looks finished is not the same as one your CNC floor can run. Here is what separates a submittal package from a truly CNC-ready file set.

Read article →
Industry Insights

The Commercial Millwork Submittal Checklist: What GCs and Architects Actually Need

Every document, drawing, and specification a GC or architect needs to approve your commercial millwork package on the first pass — organized as a checklist you can run before every submittal.

Read article →
Industry Insights

How Millwork Shops Win More Bids in 2026

Where faster, cleaner shop drawings actually move the needle on hit rate and margin — and the operational habits that separate shops that grow from shops that stall.

Read article →
Shop Drawing Guides

How to Vet a Microvellum Drafting Service Before You Send a Project

The questions that separate a Microvellum drafting partner who will run your library correctly from one who will hand back files that stall your floor.

Read article →
Shop Drawing Guides

How to Write a Millwork RFI That Gets a Fast, Useful Answer

A well-written RFI gets answered in a day and protects your schedule. A vague one stalls the job. Here is how to write requests for information that actually move a project forward.

Read article →
Software & Tools

In-House vs Outsourced Drafting: The Real Cost

A clear-eyed comparison of what an in-house drafter actually costs versus outsourcing — headcount, overhead, throughput, and the hidden costs nobody puts in the spreadsheet.

Read article →
Shop Drawing Guides

The Microvellum BricsCAD Transition: What Shops Need to Know

Microvellum is moving toward BricsCAD as its CAD engine. What that means for your library, your workflow, and your drafting partner — explained without the hype.

Read article →
Software & Tools

Microvellum vs Cabinet Vision vs AutoCAD: Which Fits Your Shop

A working comparison of the three platforms that dominate millwork drafting — what each is good at, where each struggles, and what to demand from a drafting partner on each.

Read article →
Industry Insights

The 5 Submittal Mistakes That Get Commercial Millwork Packages Kicked Back

The five specific mistakes that cause commercial millwork submittal packages to be rejected by GCs and architects — and exactly how to fix each one.

Read article →

Want a guide on a specific topic? Tell us what you're stuck on.

Ask the team →