Guides & insights

Field notes from the drafting table.

Practical guidance on shop drawings, AWI standards, software, and the operations side of running a millwork shop.

Featured · Technical

The Complete Guide to Commercial Millwork Shop Drawings (2026)

What separates a production-ready commercial millwork package from one that gets kicked back — how to scope, draft, submit, and post work that passes review the first time.

Read article
Shop Drawing Guides

What AWI compliance actually means for your drawings.

What AWI compliance actually requires of a millwork shop-drawing set — the QCP, Economy vs Custom vs Premium grades, and how Millmetric meets the standard on every deliverable.

Read article →
Shop Drawing Guides

AWI Economy vs Custom vs Premium Grades: What Each Requires of Your Drawings

A plain-language breakdown of the three AWI grades and exactly what each one demands of your shop drawings, joinery, and finish callouts.

Read article →
Shop Drawing Guides

CNC-Ready Millwork Shop Drawings: What "Ready" Actually Means

A drawing set that looks finished is not the same as one your CNC floor can run. Here is what separates a submittal package from a truly CNC-ready file set.

Read article →
Industry Insights

The Commercial Millwork Submittal Checklist: What GCs and Architects Actually Need

Every document, drawing, and specification a GC or architect needs to approve your commercial millwork package on the first pass — organized as a checklist you can run before every submittal.

Read article →
Industry Insights

How Millwork Shops Win More Bids in 2026

Where faster, cleaner shop drawings actually move the needle on hit rate and margin — and the operational habits that separate shops that grow from shops that stall.

Read article →
Shop Drawing Guides

How to Vet a Microvellum Drafting Service Before You Send a Project

The questions that separate a Microvellum drafting partner who will run your library correctly from one who will hand back files that stall your floor.

Read article →
Shop Drawing Guides

How to Write a Millwork RFI That Gets a Fast, Useful Answer

A well-written RFI gets answered in a day and protects your schedule. A vague one stalls the job. Here is how to write requests for information that actually move a project forward.

Read article →
Software & Tools

In-House vs Outsourced Drafting: The Real Cost

A clear-eyed comparison of what an in-house drafter actually costs versus outsourcing — headcount, overhead, throughput, and the hidden costs nobody puts in the spreadsheet.

Read article →
Shop Drawing Guides

The Microvellum BricsCAD Transition: What Shops Need to Know

Microvellum is moving toward BricsCAD as its CAD engine. What that means for your library, your workflow, and your drafting partner — explained without the hype.

Read article →
Software & Tools

Microvellum vs Cabinet Vision vs AutoCAD: Which Fits Your Shop

A working comparison of the three platforms that dominate millwork drafting — what each is good at, where each struggles, and what to demand from a drafting partner on each.

Read article →
Industry Insights

The 5 Submittal Mistakes That Get Commercial Millwork Packages Kicked Back

The five specific mistakes that cause commercial millwork submittal packages to be rejected by GCs and architects — and exactly how to fix each one.

Read article →

Want a guide on a specific topic? Tell us what you're stuck on.

Ask the team