Guides & insights

Field notes from the drafting table.

Practical guidance on shop drawings, AWI standards, software, and the operations side of running a millwork shop.

Featured · Shop Drawing Guides

The Complete Guide to Commercial Millwork Shop Drawings (2026)

What a commercial millwork shop drawing set contains, which AWI standards and spec sections govern it, how submittal review works, and why packages get returned.

Read article →
Shop Drawing Guides

What AWI compliance actually means for your drawings.

What AWI compliance requires of a shop drawing set: which standards apply, what AWI 100 asks for, how grade and duty level show up on the sheets, and where QCP fits.

Read article →
Shop Drawing Guides

AWI Economy vs Custom vs Premium Grades: What Each Requires of Your Drawings

What AWI Economy, Custom and Premium grades mean in the current standards, how their tolerances and matching rules differ, and what each one changes on your shop drawings.

Read article →
Shop Drawing Guides

CNC-Ready Millwork Shop Drawings: What "Ready" Actually Means

A drawing set that looks finished is not the same as one your CNC can run. Here is what CNC-ready requires, why it depends on your machine, and how to verify it.

Read article →
Industry Insights

The Commercial Millwork Submittal Checklist: What GCs and Architects Actually Need

A pre-submittal checklist for commercial millwork packages covering drawings, schedules, samples, coordination, the review cycle and production readiness.

Read article →
Industry Insights

How Millwork Shops Win More Bids in 2026

How GCs compare millwork bids, what a tight scope letter contains, and the estimating and drafting habits that raise hit rate without cutting margin.

Read article →
Software & Tools

How to Vet a Microvellum Drafting Service Before You Send a Project

The questions and the trial process that show whether a Microvellum drafting vendor can work inside your library and return files your floor can run.

Read article →
Shop Drawing Guides

How to Write a Millwork RFI That Gets a Fast, Useful Answer

A practical guide to millwork RFIs: when to raise one, how to structure it, a weak and a strong example side by side, and how to track each to a documented close.

Read article →
Industry Insights

In-House vs Outsourced Drafting: The Real Cost

Every cost line to count for an in-house drafting seat and for outsourcing, plus a step-by-step worksheet for comparing the two with your own numbers.

Read article →
Software & Tools

The Microvellum BricsCAD Transition: What Shops Need to Know

Microvellum ended updates to its OEM version in July 2025 and released a BricsCAD-based bundle. Here is what changed, what carries over, and how to test before you switch.

Read article →
Software & Tools

Microvellum vs Cabinet Vision vs AutoCAD: Which Fits Your Shop

How Microvellum, Cabinet Vision, AutoCAD and BricsCAD differ for millwork shop drawings and CNC output, and how to match each one to the way your shop builds.

Read article →
Industry Insights

The 5 Submittal Mistakes That Get Commercial Millwork Packages Kicked Back

The five drawing mistakes that most often get commercial millwork submittals returned by GCs and architects, with what each looks like and how to fix it.

Read article →

Want a guide on a specific topic? Tell us what you're stuck on.

Ask the team →